OptimalIntegrity Studio™Asset integrity

Product → Risk-based inspection

Risk-based inspection.

Rank every item by risk of failure and put the inspection where the risk is highest, to API 580 and 581.

PoFCoFRisk matrix
Vessel V-210 · risk
High
Probability4 of 5
Consequence4 of 5
Coverage82%
RiskHigh
Overdue2
Next inspQ3

Illustrative view. Real screenshots on a seeded demo unit in the build.

What it does

Risk you can rank and defend.

Probability of failure from the damage factor and consequence of failure from the fluid and inventory combine into a risk you can rank a whole estate on.

Probability of failure

Generic failure frequency adjusted by the damage factor for the active mechanism, its rate and inspection effectiveness.

  • Damage factor
  • Inspection effectiveness
  • Management factor

Consequence of failure

Flammable, toxic, environmental and business outcomes from the fluid and inventory.

  • Area or cost
  • Fluid and inventory
  • To API 581

From risk to plan

A run-length inspection plan sized to reduce the risk that matters.

  • Interval and coverage
  • Technique and effectiveness
  • Evergreen

In the app

What you see.

This feature maps to live views in the OptimalIntegrity Studio™ demo.

See it on your own assets.

Start a 14-day trial and put OptimalIntegrity Studio™ to work on real data.

14-day trial · access issued by hand · no card required